Our 1st floor bathroom has no windows, so it needs redecorating on a frequent basis. It doesn't help that it is also the location of the cats' food, water, and litter box. Need we say more?
This time around we decided to redo the maze of pipes in the basement that passed for plumbing, and to add some tiling above the shower. We are also planning on moving the vanity and to tackle the condensation problem from the toilet cistern that occurs at this time of year. The well-water is just too cold when the humidity is 95%!
Tiling was our job for last weekend (see below). Next weekend we hope to be painting, assuming that the humidity drops low enough for the paint to actually dry!